Agata North - Mineral Resource Estimate


Agata North Laterite - Mineral Resource Estimate

On November 18, 2009, Mindoro reported results of a NI 43-101-compliant mineral resource estimate at 0.5 percent nickel cutoff grade for the limonite and 0.8 percent cutoff grade for the saprolite. The resource estimate was based on a total of 408 drill holes, comprising 7,300 m of diamond drill core, covering approximately 80 percent of the delineated laterite at Agata.



Summary of Resource @ 0.5 % Ni cutoff grade (Limonite) and 0.8% cutoff grade (Saprolite)
Category Laterite Horizon

Mil. WMT

Mil.DMT Ni% Co% Fe%

Contained Ni (Mil. pounds)

Contained Co (Mil. pounds)

Measured Limonite 2.16 1.40 1.00 0.11 44 31.01 3.26
Saprolite 0.64 0.51 1.16 0.03 11 13.09  
Indicated Limonite 12.98 8.44 0.98 0.11 46 181.55 21.02
Saprolite 20.70 16.56 1.18 0.03 11 431.20  
Total Meas.+ Ind. Limonite 15.14 9.84 0.98 0.11 45 212.56 24.28
Saprolite 21.34 17.07 1.18 0.03 11 444.28  
Total 36.48 26.92 1.11 0.06 24 656.84 24.28
Inferred Limonite 1.56 1.01 0.92 0.10 44 20.49 2.17
Saprolite 3.48 2.78 1.11 0.03 12 68.26  
Total 5.03 3.79 1.06 0.05 21 88.74 2.17
  • Total metal contents in the reported resources represent metal in the ground and have not been adjusted for metallurgical recoveries and other factors which will be considered in later study.
  • Mineral resources which are not mineral reserves do not have demonstrated economic viability.
  • The tonnage and nickel grades above have been rounded to the nearest 2nd decimal, and iron grades to the nearest whole number, which may have resulted in minor discrepancies.
  • The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
  • It is uncertain if further exploration will result in upgrading the Inferred mineral resource to an Indicated or Measured mineral resource or the Indicated mineral resource to a Measured Resource category.


Sampling test pit in Agata nickel laterite

Drill rig on the Agata nickel laterite project

Sampling test pit in Agata nickel laterite
 


NEWS RELEASES
November 18, 2009  Major Upgrade For Agata North Nickel - Cobalt Laterite Resource


TECHNICAL REPORTS
December 22, 2009 Independent Report on the Nickel Laterite Resource Estimate Upgrade at Agata North