Projects:
Subscribe for Updates:
Enter your email below to receive email updates
Agata North - Mineral Resource Estimate
Agata North Laterite - Mineral Resource Estimate
On November 18, 2009, Mindoro reported results of a NI 43-101-compliant mineral resource estimate at 0.5 percent nickel cutoff grade for the limonite and 0.8 percent cutoff grade for the saprolite. The resource estimate was based on a total of 408 drill holes, comprising 7,300 m of diamond drill core, covering approximately 80 percent of the delineated laterite at Agata.
Summary of Resource @ 0.5 % Ni cutoff grade (Limonite) and 0.8% cutoff grade (Saprolite)
| Category | Laterite Horizon | Mil. WMT |
Mil.DMT | Ni% | Co% | Fe% | Contained Ni (Mil. pounds) |
Contained Co (Mil. pounds) |
| Measured | Limonite | 2.16 | 1.40 | 1.00 | 0.11 | 44 | 31.01 | 3.26 |
| Saprolite | 0.64 | 0.51 | 1.16 | 0.03 | 11 | 13.09 | ||
| Indicated | Limonite | 12.98 | 8.44 | 0.98 | 0.11 | 46 | 181.55 | 21.02 |
| Saprolite | 20.70 | 16.56 | 1.18 | 0.03 | 11 | 431.20 | ||
| Total Meas.+ Ind. | Limonite | 15.14 | 9.84 | 0.98 | 0.11 | 45 | 212.56 | 24.28 |
| Saprolite | 21.34 | 17.07 | 1.18 | 0.03 | 11 | 444.28 | ||
| Total | 36.48 | 26.92 | 1.11 | 0.06 | 24 | 656.84 | 24.28 | |
| Inferred | Limonite | 1.56 | 1.01 | 0.92 | 0.10 | 44 | 20.49 | 2.17 |
| Saprolite | 3.48 | 2.78 | 1.11 | 0.03 | 12 | 68.26 | ||
| Total | 5.03 | 3.79 | 1.06 | 0.05 | 21 | 88.74 | 2.17 |
- Total metal contents in the reported resources represent metal in the ground and have not been adjusted for metallurgical recoveries and other factors which will be considered in later study.
- Mineral resources which are not mineral reserves do not have demonstrated economic viability.
- The tonnage and nickel grades above have been rounded to the nearest 2nd decimal, and iron grades to the nearest whole number, which may have resulted in minor discrepancies.
- The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
- It is uncertain if further exploration will result in upgrading the Inferred mineral resource to an Indicated or Measured mineral resource or the Indicated mineral resource to a Measured Resource category.
![]() Sampling test pit in Agata nickel laterite |
![]() Drill rig on the Agata nickel laterite project |
![]() Sampling test pit in Agata nickel laterite |
NEWS RELEASES
| November 18, 2009 | Major Upgrade For Agata North Nickel - Cobalt Laterite Resource | |
TECHNICAL REPORTS
| December 22, 2009 | Independent Report on the Nickel Laterite Resource Estimate Upgrade at Agata North |



